How to Switch From Markate: A Practical Migration Guide
software

How to Switch From Markate: A Practical Migration Guide

How to move off Markate cleanly: what to export, how to sequence the parallel run, and how to keep quoting and invoicing running while you switch.

Roooster
Roooster Team · Product & Field Operations
October 15, 2026 · 6 min read

Switching from Markate to a new field service platform usually takes a 1 to 10 person shop about one to two weeks of part-time effort, and the reliable approach is the same for any migration: export your data first, run both tools in parallel for one to two weeks, and cut over on your slowest day. That sequence keeps your schedule intact and your history safe with essentially no downtime.

Key takeaways

  • Budget one to two weeks of part-time work, not a single rushed weekend.
  • Export customers, job history, quotes, and open invoices from Markate before canceling.
  • Clean the data (merge duplicates, fix addresses) before importing anywhere.
  • Run both systems in parallel for one to two weeks as a safety net.
  • Roooster's free trial with no credit card covers most of the parallel-run period.

What should you export from Markate before you cancel?

Nothing gets deleted until you have your own copies. Markate stores the records that make your business run, so export each of these to CSV:

  • Customers with full contact details, service addresses, and notes.
  • Job and work-order history for warranty tracking and repeat-customer context.
  • Open estimates and quotes that have not yet closed.
  • Open and recent invoices, especially unpaid ones.
  • Recurring or contract jobs with their schedules.

Keep everything in a dated backup folder and hold it for at least a year. Old job records are cheap to store and expensive to lose.

How do you avoid a messy import?

The biggest migration mistake is importing dirty data. Before you upload anything, spend an hour cleaning the customer list: merge duplicate contacts, standardize address formatting, and drop records you will never service again. A clean list of 800 real customers is more useful than a bloated list of 1,400 with duplicates.

Then map your fields deliberately. Decide which Markate tags and custom fields actually earn their place and which were clutter. Roooster imports a standard CSV, so most of the effort is getting your columns consistent before upload rather than wrestling with the tool itself.

How long does switching from Markate take?

For a small shop, sequence it like this:

  1. Days 1 to 2: export and clean your data.
  2. Days 3 to 5: import into the new system and set up services, your price book, and user accounts.
  3. Days 6 to 12: run both systems in parallel. New jobs enter the new tool; Markate stays read-only.
  4. Day 13 or 14: cut over fully and stop using Markate.

The parallel run is the whole point. If a customer or price is missing, Markate is still open so you can fix it before you depend on the new system. Because the Roooster trial needs no credit card, you can complete the parallel period before paying.

How do you keep quoting and invoicing running during the switch?

Downtime comes from confusion, not from the software. Prevent it with a clear plan:

  • Announce a hard cutover date to the whole team ahead of time.
  • Rebuild the price book once, correctly, so quotes are faster on day one than they were on Markate.
  • Train the crew for 30 minutes on the new invoicing flow so nobody reverts to old habits.

Most techs are comfortable within a few days when quoting is faster and the price book is ready. For a side-by-side look at how the two platforms differ, see the Roooster vs Markate comparison.

What happens to open invoices and jobs in progress?

Do not migrate half-finished work. Let anything already scheduled in Markate finish there, and start only new jobs in the new tool during the parallel window. For open invoices, keep collecting them on whatever channel the customer already received; there is no reason to reissue an invoice. Once the last Markate invoice is paid, close the account.

What does migration week look like day by day?

The reason a switch feels intimidating is that owners picture it as one enormous task rather than a series of small ones. Broken into daily pieces for a small shop, it looks manageable:

  • Day 1: Export every record from Markate to CSV and save it in a dated backup folder. Two hours at most.
  • Day 2: Clean the customer list. Merge duplicates, fix addresses, drop dead accounts.
  • Day 3: Import customers and history into the new system, then spot-check 20 records against the originals.
  • Day 4: Rebuild the price book and add every user with the right permissions.
  • Day 5: Enter next week's new jobs in the new tool and leave Markate read-only.
  • Days 6 to 12: Run both systems in parallel, entering all new work in the new tool.
  • Day 13 or 14: Cut over on your slowest day.

Each step is short, which is why the project fits around a normal week of jobs instead of shutting you down.

How do you tell customers about the switch?

Most customers never need to hear that you changed software. The only thing they notice is that your quotes, invoices, and reminders look different and now let them approve and pay from a phone. For anyone with an open quote or a job scheduled during cutover week, send one line: "We upgraded our quoting and invoicing system, so your next quote and receipt will look a little different, and you can approve and pay right from your phone." Everyone else just gets the smoother experience with no announcement at all. For a deeper feature-by-feature view before you decide, the Roooster vs Markate comparison breaks down where the two platforms differ.

FAQ

Will I lose customer history when I leave Markate? Not if you export first. Pull your full customer and job history to CSV before canceling and back it up. You import what you need and archive the rest for reference.

Can I use Markate and a new system at once? Yes, and it is the safest path. A one to two week parallel run lets you verify everything transferred before you rely on the new tool. Markate stays read-only during that window.

How much downtime should I expect? Almost none if you run in parallel and cut over on a slow day. The real cost is a few hours of data cleanup spread across a week or two.

Do I need to reissue open Markate invoices? No. Let existing invoices collect on their original channel and only start new jobs in the new system.

What day of the week should I cut over? Whatever your slowest day is, usually the same weekday you book the fewest jobs. A quiet cutover means a hiccup costs you a slow afternoon instead of a fully booked morning, which keeps the whole switch low-stress.

How many people do I need to run the migration? For a small shop, one organized person can handle the whole thing part-time. The owner or office manager typically does the export, cleanup, and import, then the crew joins for a 30-minute training before cutover. You do not need to hire help or shut down to switch.

Will my recurring jobs keep their schedules? Yes, if you export them with their frequency and next-service dates and verify a sample after import. Recurring schedules are the data most worth double-checking, so confirm a handful line up before you rely on the new system.

Leaving Markate is straightforward when you treat it as a planned project: export, clean, run in parallel, then cut over on a quiet day.